IORC PROJECT LIST

Oil Field Knock Out Tank

Client contacted IORC when confined space entry skills were paramount. The project was to clean out crude sediment and bottoms from one of the “free water knock out tanks” located in the oil patch in California. We were informed that last vendor could not and would not handle due to the danger of volatile gases. IORC’s experience in refinery and oil fields paved the way for us to help our client get the job done in a timely and safe manner. This project was done under budget and within specified time frames. We have now earned the position of a primary tank cleaning firm with this client.

Project 1 Photo Album (click image to view full size)
Photo description goes here Photo description goes here Photo description goes here Photo description goes here Photo description goes here Photo description goes here

Tank Farm Cleaning and Demolition

IORC was called into a highly visible and complicated tank farm decommissioning project in Orange County CA. The scope of the project was to clean out all crude collector tanks (10 AST’s & UST combined) and associated pipes to marine quality pass grade for higher metal scrap value and to demolition tank farm to ready grading of land for future home site. Confined Space Entry skills were needed with full face breathing apparatus to get the job done safely IORC worked along side several firms and agencies to insure the most efficient and safest environment existed while work was in force. IORC completed project on time and within budget.

Project 2 Photo Album (click image to view full size)

Oil Rig Site Drilling Mud Tank Cleanup and Site Cleanup

IORC has gained the reputation for working hand in hand within the oil drilling community by being ready for the call to action. IORC was called into action to clean up an oil drill site. Confined Space Entry skills were needed with full face breathing apparatus to get the job done safely. IORC cleaned up all holding, mixing and drilling mud tanks to cleanliness specs needed to remove tank back to tank leasing company. IORC also conducted general equipment and site clean up for client to insure equipment and site was clean of all material generated by drilling rig set up and tear down.

Project 3 Photo Album (click image to view full size)

Oil Field Knock Out Tank

IORC was contract to clean out a very large knock out vessel. Confined Space Entry skills were needed with full face breathing apparatus was needed to get the job done safely. This project was completed under budget and on time.

Project 4 Photo Album (click image to view full size)

Power Plant Turbine Oil Filtration and Reservoir Cleaning

IORC was contracted to filter 5,000 gallons of high quality Turbine Oil that was contaminated with water do to a heat exchanger leak in the hydraulic system of a major power plant. The space was difficult to access so IORC devised an approach utilizing one of our stainless steel portable holding tanks to help up isolate and clean the product, while we cleaned out the reservoir simultaneously. This project was time sensitive and IORC completed project in half the time required by our client.

Project 5 Photo Album (click image to view full size)

Major Oil Pumping Station Service

IORC was contracted to work with a Major pipeline operator with one of its pumping stations. IORC clean out water contaminated crank case oils. Our challenge was to minimize pipeline downtime while filtering the water out of the oil to predetermined field specifications. IORC completed the job on time and to spec.

Project 6 Photo Album (click image to view full size)
         

Oil Field Crude Tank Cleanup

IORC was contacted to clean out Weatherford tanks on site in the oil fields of California. Confined Space Entry skills were needed with full face breathing apparatus was needed to get the job done safely.

Project 7 Photo Album (click image to view full size)
     

Emergency Oil Spill Cleanup and Oil Salvaging Project

Major Power Plant experienced a Hydraulic Reservoir spill. Product was captured in burmed containment area. IORC was called for emergency spill response and to determine clean-ability of the turbine oil. IORC was able to filter contained oil to meet industry OEM cleanliness specifications. IORC then cleaned up containment area and general site clean-up. Customer saved on the purchasing of new oils and IORC mitigated the cost of waste oil and transportation cost.

Project 8 Photo Album (click image to view full size)
     

Major Power Plant Outage and Turn Around Project

Major Power Plant Outage. IORC was contracted for emergency multiple tank reservoir cleaning and turbine oil filtration with a plant that experienced unscheduled down time. IORC worked on site around the clock under the direction of facilities manager until project was complete. IORC provide back up/stand by emergency filtration equipment for a period of 6 weeks until facilities were up and running to full capacity.